Metea Valley High School
- Location: Aurora, IL
- Weight of Steel: 1876 tons
- Contractor: Turner Construction
- This is a 3-story high school designed by DLR Group.
- This project held a high challenge in that the site purchased fell through and over 3 months of time was lost. The owner and Turner Construction came to CSI and asked us to super-accelerate the project. We exceeded the schedule by 5 months.